Projects.

PMHC – Bridge Assessment Program

PMHC – Bridge Assessment Program

Port Macquarie Hastings Council engaged Ductile Consulting Engineers to assess heavy vehicle capacity across its bridge network. Ductile evaluated 91 bridges and, using automated tools, delivered efficient insights and clear recommendations to guide access.

read more
Orlando St Bridge Level 3 Inspection

Orlando St Bridge Level 3 Inspection

Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.

read more
Wind Farm Projects

Wind Farm Projects

We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.

read more
Flood Recovery Projects

Flood Recovery Projects

Ductile Consulting Engineers supported regional councils with recovery from the 2022 floods. This included inspections, damage assessments, repair scoping and cost estimates, EPAR preparation and support with design, procurement and construction.

read more