Wind Farm Projects.
Client.
Various
Location.
Project Description.
Ductile Consulting Engineers has been engaged to assess suitability of bridges, culverts, and other road structures to sustain loads from Over Size Over Mass (OSOM) vehicles required for wind farm developments in three Renewable Energy Zones (REZ)s in NSW.
Our staged approach offers value for money, starting with Level 1 inspections (for minor structures), Level 2 inspections (bridges and major culverts) and Tier 1-2D assessments (bridges and major culverts) to screen for capability and condition. Level 3 inspections and/or detailed Tier 2 assessments may be required for structures that don’t pass the initial screening. For structures that are found inadequate by detailed assessments, we can assess options for strengthening, rehabilitation, or replacement and provide recommendations on the most appropriate course of action to enable the OSOM vehicle movements.
![18690eff-aabf-4b02-a839-bdb25f39454c](https://ductile.com.auwp-content/uploads/2024/05/WF_1.jpg)
Other Projects.
Garoo Bridge Upgrades
As part of an initiative to improve freight productivity, Tamworth Regional Council sought to gazette Garoo Rd and Lindsays Gap Rd for Higher Mass Limit (HML) B-double vehicles.