Tamworth Regional Council –

L2 Bridge Inspections.

Client.

Tamworth Regional Council

Location.

Tamworth, NSW

Project Description.

 

A large number of Tamworth Regional Council’s (TRC) bridge and culvert structures were overdue for Level 2 inspection. TRC engaged Ductile Consulting Engineers (DCE) to undertake inspections of 64 bridges and 122 major culverts.

Our Role

DCE were engaged to undertake the following:

  • Level 2 inspections;
  • Inspection reporting; and
  • Network summary reporting.

Value Delivered
By using an tailored inspection methodology for culverts (TfNSW Culvert Inspection and Risk methodology) rather than the bridge inspection manual (TMR SIM used for bridges), we were able to provide significantly cheaper inspection reports, with inspection data tailored to suit culverts.

Tamworth RC

Other Projects.

Swimming Pool Condition Assessments

Swimming Pool Condition Assessments

Ductile Consulting Engineers provided; structural and mechanical condition assessments of Liverpool Plains Shire Councils swimming pool facilities at Quirindi and Werris Creek.

read more
Garoo Bridge Upgrades

Garoo Bridge Upgrades

As part of an initiative to improve freight productivity, Tamworth Regional Council sought to gazette Garoo Rd and Lindsays Gap Rd for Higher Mass Limit (HML) B-double vehicles.

read more