Tamworth Regional Council –
L2 Bridge Inspections.
Client.
Tamworth Regional Council
Location.
Tamworth, NSW
Project Description.
A large number of Tamworth Regional Council’s (TRC) bridge and culvert structures were overdue for Level 2 inspection. TRC engaged Ductile Consulting Engineers (DCE) to undertake inspections of 64 bridges and 122 major culverts.
Our Role
DCE were engaged to undertake the following:
- Level 2 inspections;
- Inspection reporting; and
- Network summary reporting.
Value Delivered
By using an tailored inspection methodology for culverts (TfNSW Culvert Inspection and Risk methodology) rather than the bridge inspection manual (TMR SIM used for bridges), we were able to provide significantly cheaper inspection reports, with inspection data tailored to suit culverts.
Other Projects.
Swimming Pool Condition Assessments
Ductile Consulting Engineers provided; structural and mechanical condition assessments of Liverpool Plains Shire Councils swimming pool facilities at Quirindi and Werris Creek.
Garoo Bridge Upgrades
As part of an initiative to improve freight productivity, Tamworth Regional Council sought to gazette Garoo Rd and Lindsays Gap Rd for Higher Mass Limit (HML) B-double vehicles.


