Tamworth Regional Council –
L2 Bridge Inspections.
Client.
Tamworth Regional Council
Location.
Tamworth, NSW
Project Description.
A large number of Tamworth Regional Council’s (TRC) bridge and culvert structures were overdue for Level 2 inspection. TRC engaged Ductile Consulting Engineers (DCE) to undertake inspections of 64 bridges and 122 major culverts.
Our Role
DCE were engaged to undertake the following:
- Level 2 inspections;
- Inspection reporting; and
- Network summary reporting.
Value Delivered
By using an tailored inspection methodology for culverts (TfNSW Culvert Inspection and Risk methodology) rather than the bridge inspection manual (TMR SIM used for bridges), we were able to provide significantly cheaper inspection reports, with inspection data tailored to suit culverts.
Other Projects.
Strategic Local Government Asset Assessment Project (SLGAAP)
The National Heavy Vehicle Regulators (NHVR)s Strategic Local Government Asset Assessment Project (SLGAAP) is an Australian Government funded initiative to optimise heavy vehicle access on local road networks across Australia.
Wind Farm Projects
We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.
Flood Recovery Projects
Ductile Consulting Engineers supported regional councils with recovery from the 2022 floods. This included inspections, damage assessments, repair scoping and cost estimates, EPAR preparation and support with design, procurement and construction.



