OSOM Vehicle Access Assessment – Specialist Engineering Advice.
Client.
South Burnett Regional Council
Location.
South Burnett, Qld
Project Description.
South Burnett Regional Council sought specialist engineering advice to support heavy vehicle access planning for the proposed Tarong West Wind Farm development. Ironpot Road was identified as a key transport route for oversized and overmass (OSOM) vehicles carrying wind turbine components from the Port of Brisbane to the development site.
The project involved an independent technical review of structural assessments for four concrete structures along Ironpot Road, comprising two bridges and two major culverts.
Our Role
We completed a peer review of the existing structural assessment report, including assessment methodologies, reference vehicles, load factors and structural modelling assumptions. Particular attention was given to the suitability of the assessments for OSOM vehicle movements and the potential influence of bridge substructure capacity.
The review was designed to identify technical issues requiring clarification and provide Council with independent engineering advice to support informed decisions about heavy vehicle access along the proposed transport route.
Value Delivered
Our independent technical review provided South Burnett Regional Council with greater confidence in the structural assessments of key transport infrastructure along Ironpot Road. By identifying potential technical issues and clarifying assessment findings, Ductile helped Council make informed decisions about OSOM vehicle access while balancing infrastructure safety and the transport requirements of the proposed Tarong West Wind Farm.
Other Projects.
Flood Recovery Projects
Ductile Consulting Engineers supported regional councils with recovery from the 2022 floods. This included inspections, damage assessments, repair scoping and cost estimates, EPAR preparation and support with design, procurement and construction.
Bridge Network Condition & Capability Assessments
GSC engaged Ductile Consulting Engineers to assess its bridge network. Initial inspections identified which bridges met service requirements, with targeted follow-up informing management actions.
Level 3 Timber Bridge Assessments
Armidale Regional Council had concerns over the capacity of three timber bridges. Ductile Consulting Engineers were engaged to undertake load rating assessments and provide management advice for the bridges.



