Orlando St Bridge Level 3 Inspection

Client.

City Of Coffs Harbour

Location.

Coffs Harbour, NSW

Project Description.

Routine inspections of the Orlando St Bridge identified significant spalling
and deterioration in the tidal zone. The City of Coffs Harbour engaged
Ductile Consulting Engineers to assess the damage and provide expert
advice for the management and remediation of the structure.

Our Role

  • Undertake detailed NDT, sampling and laboratory testing;
  • Undertake a load rating assessment to determine the remnant
    capacity of the structure; and
  • Recommend suitable repairs.

Value Delivered

Through our detailed assessment, we were able to justify not imposing a load restriction on the bridge. Working with our project partner, Remedial Technology, we were able to specify a range of remediation techniques, including impressed current cathodic protection, to extend the life of the bridge by at least 30 years at a fraction of the replacement cost.

Other Projects.

Wind Farm Projects

Wind Farm Projects

We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.

read more
Flood Recovery Projects

Flood Recovery Projects

Ductile Consulting Engineers supported regional councils with recovery from the 2022 floods. This included inspections, damage assessments, repair scoping and cost estimates, EPAR preparation and support with design, procurement and construction.

read more