Level 3 Timber Bridge Assessments.

Client.

Armidale Regional Council

Location.

New South Wales

Project Description.

Armidale Regional Council had concerns over the capacity of three timber bridges. Ductile Consulting Engineers were engaged to undertake load rating assessments and provide management advice for the bridges.

Ductile Consulting Engineers:

  • Reviewed previous inspection and assessment reports
  • Undertook timber bridge inspections including timber drilling surveys
  • Developed calculations and finite element models of the bridges
  • Determined the residual capacity of the bridges
  • Prepared assessment reports and briefed ARC on the findings.

Through our assessments, we were able to recommend realistic load limits and practical management actions to enable continued use of the bridges until their planned replacements. 

Other Projects.

Orlando St Bridge Level 3 Inspection

Orlando St Bridge Level 3 Inspection

Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.

read more
Wind Farm Projects

Wind Farm Projects

We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.

read more