Flood Recovery Projects.
Client.
Various
Location.
Project Description.
2022 saw flooding on a massive scale across eastern Australia. Ductile Consulting Engineers was there with feet on the ground, helping several regional councils get back on their feet.
Work undertaken included:
- Level 1 and Level 2 inspections
- Damage assessments
- Repair scoping and cost estimates
- Preparation of Essential Public Asset Reconstruction (EPAR)
- Repair design, procurement, and construction support
Other Projects.
Orlando St Bridge Level 3 Inspection
Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.
Strategic Local Government Asset Assessment Project (SLGAAP)
The National Heavy Vehicle Regulators (NHVR)s Strategic Local Government Asset Assessment Project (SLGAAP) is an Australian Government funded initiative to optimise heavy vehicle access on local road networks across Australia.
Wind Farm Projects
We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.



