Flood Recovery Projects.
Client.
Various
Location.
Project Description.
2022 saw flooding on a massive scale across eastern Australia. Ductile Consulting Engineers was there with feet on the ground, helping several regional councils get back on their feet.
Work undertaken included:
- Level 1 and Level 2 inspections
- Damage assessments
- Repair scoping and cost estimates
- Preparation of Essential Public Asset Reconstruction (EPAR)
- Repair design, procurement, and construction support
Other Projects.
Level 3 Structural Assessment – Walcha Council
We undertook a Level 3 structural assessment of G R Hicks Bridge, evaluating its load-carrying capacity and investigating concrete deterioration. We provided recommendations for targeted repairs, heavy vehicle access and ongoing asset management to support the bridge’s long-term serviceability.
PMHC – Bridge Assessment Program
Port Macquarie Hastings Council engaged Ductile Consulting Engineers to assess heavy vehicle capacity across its bridge network. Ductile evaluated 91 bridges and, using automated tools, delivered efficient insights and clear recommendations to guide access.
Orlando St Bridge Level 3 Inspection
Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.



