Flood Recovery Projects.
Client.
Various
Location.
Project Description.
2022 saw flooding on a massive scale across eastern Australia. Ductile Consulting Engineers was there with feet on the ground, helping several regional councils get back on their feet.
Work undertaken included:
- Level 1 and Level 2 inspections
- Damage assessments
- Repair scoping and cost estimates
- Preparation of Essential Public Asset Reconstruction (EPAR)
- Repair design, procurement, and construction support
![7c147ab8-e2dd-4723-9693-593716e5e865](https://ductile.com.auwp-content/uploads/2024/05/Flood_1.jpg)
Other Projects.
Strategic Local Government Asset Assessment Project (SLGAAP)
The National Heavy Vehicle Regulators (NHVR)s Strategic Local Government Asset Assessment Project (SLGAAP) is an Australian Government funded initiative to optimise heavy vehicle access on local road networks across Australia.
Wind Farm Projects
Ductile Consulting Engineers has been engaged to assess suitability of bridges, culverts, and other road structures to sustain loads from Over Size Over Mass (OSOM) vehicles required for wind farm developments in three Renewable Energy Zones (REZ)s in NSW.
Bridge Network Condition & Capability Assessments
GSC engaged Ductile Consulting Engineers (through Constructive Solutions Pty Ltd) to undertake Level 2 and Level 3 inspections of their network.