Bridge Network Condition & Capability Assessments.

Client.

Gunnedah Shire Council

Location.

New South Wales

Project Description.

GSC engaged Ductile Consulting Engineers (through Constructive Solutions Pty Ltd) to undertake Level 2 and Level 3 inspections of their network.

To ensure cost-effective outcomes that maximise the level of insight into the network, we proposed a two-stage program.  The first stage included level 2 inspections of all bridges, and Tier 1-2D assessments of all bridges where previous assessments had not been completed.

From the first stage, we were able to identify which bridges were meeting councils level of service requirements, and which bridges needed further attention.

The second stage of the program included level 3 inspections on 3 bridges, and analysis to determine appropriate management actions for the network.

Other Projects.

Flood Recovery Projects

Flood Recovery Projects

Ductile Consulting Engineers supported regional councils with recovery from the 2022 floods. This included inspections, damage assessments, repair scoping and cost estimates, EPAR preparation and support with design, procurement and construction.

read more
Level 3 Timber Bridge Assessments

Level 3 Timber Bridge Assessments

Armidale Regional Council had concerns over the capacity of three timber bridges. Ductile Consulting Engineers were engaged to undertake load rating assessments and provide management advice for the bridges.

read more