Bridge Network Condition & Capability Assessments.

Client.

Gunnedah Shire Council

Location.

New South Wales

Project Description.

GSC engaged Ductile Consulting Engineers (through Constructive Solutions Pty Ltd) to undertake Level 2 and Level 3 inspections of their network.

To ensure cost-effective outcomes that maximise the level of insight into the network, we proposed a two-stage program.  The first stage included level 2 inspections of all bridges, and Tier 1-2D assessments of all bridges where previous assessments had not been completed.

From the first stage, we were able to identify which bridges were meeting councils level of service requirements, and which bridges needed further attention.

The second stage of the program included level 3 inspections on 3 bridges, and analysis to determine appropriate management actions for the network.

Other Projects.

Level 3 Structural Assessment – Walcha Council

Level 3 Structural Assessment – Walcha Council

We undertook a Level 3 structural assessment of G R Hicks Bridge, evaluating its load-carrying capacity and investigating concrete deterioration. We provided recommendations for targeted repairs, heavy vehicle access and ongoing asset management to support the bridge’s long-term serviceability.

read more
PMHC – Bridge Assessment Program

PMHC – Bridge Assessment Program

Port Macquarie Hastings Council engaged Ductile Consulting Engineers to assess heavy vehicle capacity across its bridge network. Ductile evaluated 91 bridges and, using automated tools, delivered efficient insights and clear recommendations to guide access.

read more
Orlando St Bridge Level 3 Inspection

Orlando St Bridge Level 3 Inspection

Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.

read more