Bridge Network Condition & Capability Assessments.

Client.

Gunnedah Shire Council

Location.

New South Wales

Project Description.

GSC engaged Ductile Consulting Engineers (through Constructive Solutions Pty Ltd) to undertake Level 2 and Level 3 inspections of their network.

To ensure cost-effective outcomes that maximise the level of insight into the network, we proposed a two-stage program.  The first stage included level 2 inspections of all bridges, and Tier 1-2D assessments of all bridges where previous assessments had not been completed.

From the first stage, we were able to identify which bridges were meeting councils level of service requirements, and which bridges needed further attention.

The second stage of the program included level 3 inspections on 3 bridges, and analysis to determine appropriate management actions for the network.

Other Projects.

Orlando St Bridge Level 3 Inspection

Orlando St Bridge Level 3 Inspection

Routine inspections of the Orlando St Bridge revealed significant deterioration, leading to Ductile Consulting Engineers being engaged. Their analysis confirmed no load restriction was needed and informed repairs to extend the bridge’s life by at least 30 years at a fraction of replacement cost.

read more
Wind Farm Projects

Wind Farm Projects

We assessed bridges, culverts and other road structures across 3 NSW Renewable Energy Zones to assess suitability for OSOM vehicle movements for wind farm developments. Using a staged assessment approach, we identified structures requiring further assessment or upgrade, to help plan safe and cost-effective transport routes.

read more